Our job: Okna po remoncie„Po remoncie mieszkanie było pełne pyłu. Ekipa zostawiła wszystko naprawdę czyste.”
Natalia · Po remoncie
After renovation cleaning Krakow by CleanAI covers construction dust removal, floor cleaning, windows, kitchen, bathroom and surfaces after renovation work. We arrive with professional equipment and confirm the scope before booking.
A two-room flat after a full renovation: from the door to handing back the keys takes 6 to 9 hours. We need power, running water and an empty place, with no crew working alongside us.
You pick the size of the flat, extras, date and hour. You see the price at once and the confirmation arrives by e-mail.
The day before we ask about the stage of the works, the type of floors, the number of windows and whether bags of rubble are still there. You can send photos in the chat: they tell us how much time to block out.
We bring HEPA vacuums, mops, buckets, a ladder and the products. We do not use your equipment and we do not leave dirty water in the bath.
We start at ceilings, lights and the tops of wardrobes, work down through walls, skirting boards and radiators to the floors. Dust is vacuumed, not wiped, so it does not go straight back up.
Floors, joinery, tiles and ceramics washed with frequent water changes. The first pass lifts the film; only the second and third leave a surface without streaks.
We walk the flat together, check corners, skirting boards and grout, and fix anything on the spot. You pay after the job: cash, BLIK, card or online.
Pick the size of the flat after renovation, a date and extras. You see the price at once and pay after the job or right away online.
Choose service options
Nearest available dates and times
Days with a green badge are discounted. Discounts do not stack: the largest one applies — date, promo code or subscription.
Morning
Afternoon
Evening
Add to your order for an extra fee
Order together - cheaper as a package!
Chair cleaning
Special price when ordering cleaning
Needed to confirm your order
Choose a convenient payment method
Have a promo code? Enter it here
Products included. Travel free within Kraków.
Times for a two-room flat after a full renovation with a two-person crew. A place after painting alone takes half as long; a flat after new plumbing and screed takes a few hours more.
15–20 min
Arrival and survey
Walk-through, work plan, protecting whatever must stay untouched, setting up.
1–3 h
Dry dust removal
Vacuuming from ceiling to floor, HEPA, gaps, skirting boards, radiators, inside fitted units.
3–8 h
Wet cleaning
Several passes with water changes: joinery, bathroom, kitchen, grout, floors last.
30–60 min
Floors drying
Laminate and stoneware dry in half an hour, then furniture can come in.
The best slot is the day after the crew leaves and before the furniture arrives: an empty flat is cleaned faster, cheaper and better, and the dust never gets into upholstery and wardrobes.
Real jobs in Kraków. The result photos come from our own visits.
The results speak for themselves


Paint marks, dust


Construction dust


Deep cleaning


Cleanup after the crew
Updated:
After-renovation cleaning Krakow means bringing a flat to the state where furniture can come in and you can live there. Construction dust is nothing like household dust: it is as fine as flour, sharp under the finger and lifts with every movement, so one pass with a mop is never enough. We work top down and in several passes: first the dust comes up dry, then the surfaces are washed, and at the end we return to whatever the settling dust reached while we worked.
We vacuum with HEPA-filtered machines so the finest fraction does not go back into the air through the exhaust. Water gets changed often, because cement and plaster stirred into a bucket turn a mop into a smearing tool. Each surface gets its own product: one for primer streaks on porcelain stoneware, another for greasy silicone marks, another for joinery and lacquered fronts, which hard dust scratches easily.
We are booked by owners of flats after renovation and after handover from a developer, by investors preparing a place to rent, by companies after fitting out an office or a shop, and by renovation crews who want to hand the client a finished flat. We cover every district of Krakow and the neighbouring communes: Wieliczka, Skawina, Zielonki, Niepołomice, Zabierzów.
The price follows the size of the flat and how much dust the builders left. This is not the same job as a fortnightly tidy-up: construction dust sits everywhere and only comes off over several passes, so post-renovation packages have their own price list. We arrive with vacuums, mops and products, travel within Krakow is included. You see the price before booking and pay after the job.
| Property | Price | Working time | What it covers |
|---|---|---|---|
| Studio | 350 zł | 4–6 h | room, kitchenette, hallway, bathroom |
| 1 room | 450 zł | 5–7 h | room, kitchen, hallway, bathroom |
| 2 rooms | 550 zł | 6–9 h | 2 rooms, kitchen, hallway, bathroom |
| 3 rooms | 700 zł | 8–12 h | 3 rooms, kitchen, hallway, bathrooms |
| 4 rooms | 850 zł | 10–14 h | 4 rooms, kitchen, hallway, bathrooms |
| Windows with frames and sills | 40 zł/pc | 20–30 min | add-on, charged per window |
| Renovation waste removal up to 1 m³ | 150 zł | 30–60 min | add-on: boxes, foil, leftovers |
| Kitchen cabinets inside | 65 zł | 45–60 min | add-on to the package |
| Oven inside | 60 zł | 30–40 min | add-on to the package |
| Cooker hood | 50 zł | 20–30 min | add-on to the package |
| Balcony or loggia after renovation | 35 zł | 30–45 min | add-on to the package |
| Extra hour of work | 45 zł | 60 min | when the job is bigger than the package |
Ozone treatment after painting and varnishing 70 zł per room. Cleaning a rug brought in after the works, up to 4 m², 70 zł. For large flats two or three of us come: the price from the list stays the same, the job simply takes less time. Regular apartment cleaning has its own, cheaper price list, because it is a different job.
After a renovation the dirt is hard and stuck on rather than greasy like in a kitchen. Honestly, below: what we take off as part of the cleaning, and what is building work that needs chipping or sanding.
| Type of grime | Result | How we do it |
|---|---|---|
| Cement and plaster dust on everything | high | HEPA vacuum top down, then washing in several passes with water changes |
| Primer streaks and cement film on stoneware | high | Acidic product for building residue, briefly, then rinsed; natural stone only ever gets pH-neutral |
| Light paint and mortar traces on floors and tiles | medium to high | Spot work with a plastic scraper and a product; hard spots are left so the surface is not scratched |
| Hardened mortar, tile adhesive, thick primer | none | That is building work: chipping and sanding stay with the renovation crew |
| Silicone and expanding foam on glass and frames | none | Comes off with a blade and solvent, at the risk of scratches; not part of cleaning |
| Dust in gaps, cable trunking, behind radiators | high | Crevice tools and brushes: this is exactly where dust comes back from a week later if skipped |
| Stickers and protective film on taps, doors, appliances | high | Removed together with the glue using a label remover, gentler on acrylic glass and lacquer |
| Grout haze and limescale in the bathroom | high | Grout and limescale product, brush, two passes; fresh grout never scrubbed dry |
| Masking tape marks on walls and joinery | medium | The glue comes off; matt paint can rub through, and we say so before trying |
| Sanding dust before painting | not included | That is preparation for painting, not final cleaning; the crew does it before their work |
| Smell of paint, varnish and glue | medium | Airing and washing reduce it; the rest is broken down by ozone treatment, an add-on from the price list |
| Scratches, burns, damaged finishes | none | That is damage, not dirt; we point it out at handover so it is not blamed on the cleaning |
If building work is still going on, final cleaning makes no sense: the dust is back after the first tile cut. In that case we book a date after the crew leaves.
Fresh finishes are more delicate than ones that have been in use for years: paint hardens over weeks, grout cures for days, and parquet lacquer dulls easily. So the product follows not only the material but the age of the surface.
| Surface | Product | Notes |
|---|---|---|
| Unglazed stoneware and tiles after grouting | acidic product for building residue | Short contact and a rinse; without it the cement film stays as a white haze |
| Terracotta, clinker, textured tiles | brush and grout product | The texture holds dust in its hollows, so two passes are needed |
| Laminate and vinyl flooring | laminate cleaner, well-wrung mop | Water in fresh joints swells the edges; we mop almost dry |
| Parquet and lacquered boards | pH-neutral cleaner | Lacquer cures for up to three weeks: no scrubbing, no steam, no alkaline detergents |
| Oiled parquet | soap for oiled wood | Ordinary cleaner washes fresh oil out; dust is never wiped dry, it scratches |
| Natural stone: marble, travertine | pH-neutral only | Acidic residue removers etch stone in seconds, so here the work is mechanical |
| Freshly painted walls | vacuum and dry microfibre | Paint reaches full hardness in weeks; a wet cloth leaves marks and strips the matt finish |
| Stretch and suspended ceilings | soft cloth, no pressure | Stretch film scratches from the dust itself; we dust at a distance and never press |
| Joinery: doors, frames, skirting boards | joinery cleaner, microfibre | Dust under handles and along the top edge of a door is the spot most often missed |
| Glass and mirrors | glass cleaner, squeegee | The dust itself comes off wet; dried silicone and paint on glass is separate, building work |
| Taps, ceramics, acrylic bath | limescale remover, mild on acrylic | Hard dust grains scratch acrylic, so we rinse first and only then wipe |
| Lacquered fronts and kitchen units | glass cleaner or neutral soap | Construction dust works like sandpaper: always wet, never dry |
Fitted units are opened and vacuumed inside: shelves, drawers and plinths are the first place dust returns from a week later.
After a renovation the cleaning usually goes one of three ways. The difference is less about price than about how many times you have to come back to it.
| Criterion | CleanAI after renovation | The crew at the end | Yourself |
|---|---|---|---|
| Price | fixed per package, 2 rooms 550 zł, visible before booking | usually inside the renovation price, or 200–400 zł added | equipment, bags and products plus two weekends |
| Equipment | HEPA vacuums, flat mops, ladder, our own buckets | a workshop vacuum and a builder's mop | a household vacuum, which construction dust often kills |
| Scope | a written package plus extras, you know what is included | sweeping and picking up the worst of it | whatever you have energy for after the works |
| How many passes | several, until the dust stops coming back | one | as many as you can stand |
| Result | a flat ready for the furniture to come in | visibly cleaner, dust returns within days | depends on persistence, usually two or three goes |
| Who answers for scratches | we come after the works and record damage at handover | hard to separate the renovation from the cleaning | you |
| What it costs you in time | one day, you do not need to be there | an hour at the end of their work | two weekends and bags down the stairs |
The crew clears the rubble and the worst of the mess, as it should. Final cleaning is a different job: fine dust, grout, gaps, joinery and several passes with water, after which the flat is fit to move into.
The best moment is the day after the crew leaves, when the bags and tools are gone and the furniture is not in yet. An empty flat is cleaned faster and cheaper, and the dust never reaches upholstery, mattresses and the clothes in the wardrobe. If the furniture is already in, we will still come: vacuuming the furniture and working around it usually adds two hours.
The second typical moment is taking a flat over from a developer or handing it to a tenant. Here it matters that the place looks like a catalogue photo at the key handover: clean grout, glass without stickers, skirting boards without dust, taps washed. Such a booking usually gets windows and the removal of packaging left after fitting added to it.
After smaller works, a repaint or a single new bathroom, the cleaning takes a few hours and costs less than a full package: pick the nearest property size, describe the scope in the notes, and we will agree the real time when we confirm. If the renovation is still running and tiles are yet to be cut or floors sanded, wait: cleaning in the middle of the works is money thrown away.
Post-construction cleaning in Krakow takes us to the new estates in Podgórze Duchackie, Ruczaj, Bronowice, Prądnik Biały and Czyżyny, where flats are handed over by the developer with sanding dust and stickers still on the joinery. In the tenements of the Old Town and Kazimierz there is screed and old plaster dust as well, equipment carried up without a lift, and care around period joinery and floors. In commercial units and offices we work after hours or at the weekend so the opening date does not move.
Outside Krakow we travel to Wieliczka, Skawina, Zielonki, Zabierzów, Mogilany and Niepołomice, where we most often clean houses after a fit-out: stairs, a garage and a terrace are added there, and the job is planned for a full day. Up to 15 km from the city limits the travel fee is fixed, up to 30 km as well, and you see the amount in the summary as soon as you type the address. For developers and fit-out companies handing over several flats in one building we agree a fixed price per flat and a single trip for the whole working day.
After-renovation cleaning in Krakow following a full flat renovation covers everything in the package: dust from every surface, joinery, radiators, bathroom and kitchen, floors over several passes. After a single room, a bathroom or a kitchen, people take the smallest package and describe the scope in the notes: what counts there is time, not the number of rooms. After a repaint the work is lighter because there is less dust, but removing tape marks and washing the joinery around doors and windows is added.
Cleaning flats after renovation in Krakow before letting them out is usually combined with window cleaning and upholstery cleaning if the furniture stayed: this is the only moment when the flat is empty and everything can dry before a tenant moves in. When handing a unit over to an investor it is worth adding the removal of fitting leftovers, because appliance boxes and film stay behind even after a tidy crew.
Post-construction cleaning of a house after a fit-out is usually two days of work or a three-person crew: stairs, two bathrooms, a garage and a terrace make a difference that the floor area alone does not show. We confirm such quotes from photos or after a short visit, so the price does not change while the work is running.
Answers to the questions we hear most often before the first visit.
A studio 350 zł, a 1-room flat 450 zł, 2 rooms 550 zł, 3 rooms 700 zł, 4 rooms 850 zł. Travel within Krakow, products and equipment are included. Windows, waste removal and the inside of cabinets are add-ons from the price list, which you add when booking and see in the summary before confirming.